01Eligibility
Does your house fit? The Brace + Bolt checklist
Program checklist
- Wood-framed house built before 1980
- Raised foundation with a crawlspace (not a slab)
- Cripple walls, if present, within the program's height limit. CRMP's standard plan covers cripple walls 4 feet or shorter; check the current program rules if yours are taller
- A house with a tall concrete stem wall and no cripple walls can qualify for a bolt-only retrofit
- The house is in a ZIP code on CRMP's current eligible list
- You register during the open window and are selected in the random draw
- The work is done to California Existing Building Code Chapter A3, with a building permit
Two retrofit types are funded: Brace and Bolt for houses with cripple walls and Bolt-Only for houses on stem walls (CRMP). The program's rules can change each year; confirm details on CRMP's site before registering.
02ZIP codes
Walnut Creek–area ZIP codes on the 2025 list
| Community | ZIP codes | Status |
|---|---|---|
| Walnut Creek | 94595, 94596, 94597, 94598 | On the 2025 Northern California list |
| Concord | 94518, 94519, 94520, 94521, 94523 | On the 2025 list |
| Danville (Blackhawk shares 94506) | 94506, 94526 | On the 2025 list |
| Orinda | 94563 | On the 2025 list |
| Lafayette, Moraga, Clayton, Alamo | 94549, 94556, 94517, 94507 | Check your exact ZIP with CRMP's eligibility lookup |
ZIP lists are set for each registration period. Confirm your address with CRMP's own lookup when registration opens.
03How it works
How Brace + Bolt works, step by step
- Register on CRMP's website while registration is open. As of October 4, 2026, 2026 dates had not been announced.
- Selection is by random draw. Selected homeowners are notified and given a deadline to proceed.
- Choose a contractor from CRMP's directory: a California-licensed general contractor with an A or B license who has completed the program training (CRMP FAQ).
- Permit and retrofit. The contractor pulls a building permit and does the work to Chapter A3. A typical EBB retrofit costs $3,000–$7,000+.
- Final inspection and documents. After the permit is finaled, you submit the required paperwork and the grant is paid toward the cost.
04Not selected?
If your house isn't selected
A retrofit doesn't have to wait for the draw. The same Chapter A3 bolt-and-brace work can be permitted and done any time, and a qualifying retrofit can still earn a California Earthquake Authority premium discount (CEA). Many owners also get a quote now so they are ready if selected next year. See how a retrofit works and whether it is worth it.
05Questions
Brace + Bolt questions
How much does Earthquake Brace + Bolt pay?
When does Brace + Bolt registration open in 2026?
Can I choose any contractor?
What if my house is not selected?
Is this site part of the Brace + Bolt program?
Sources · read October 4, 2026
